2008年9月22日星期一

Pass4side IBM 000-238考试题库 2

题库内容摘自www.pass4side.cn 。更新时间:2008-9-20
6. A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs. Thecurrent applications are certified on AIX 5.2 but not yet on AIX 5.3. The customer wants to understand theadvantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing theircurrent applications. Which of the following points should the pSeries technical specialist highlight?
A. The p5-570 would save rack space over a pair of p5-550 servers.
B. The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR forperformance testing.
C. The p5-570 can only be upgraded to 64GB of RAM without replacing memory.
D. The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of thecustomer's applications with fewer processors and fewer I/O adapters.
Answer: B
7. The account team designed a p5-570 solution to strategically position the customer for future IBMannouncements. The customer was dissatisfied upon implementing the solution. An AIX v5.1 partition wasadded to the requirements halfway through the solution design process and it was not considered in the finaldesign. What should the pSeries technical specialist have done to prevent this situation?
A. Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570
B. Designed a p670 because it supports AIX 5.1 partitions
C. Initially designed a solution supporting AIX 5.1 partitions
D. Gained customer approval for the final design prior to ordering the system
Answer: D
8. After months of negotiations and several proposals, the customer indicates that they may be ready to purchase apSeries system. Rather than quickly ordering the last configuration proposed, what is the most appropriate nextstep for a pSeries technical specialist to improve the chance of a successful project?
A. Obtain buy-in and feedback from the customer.
B. First ask the client executive if financing has been arranged.
C. Plan the installation and rollout schedule before ordering.
D. Confirm that any additional requirements are handled by others.
Answer: A
9. A customer is evaluating the purchase of a new p570 8-way Express to replace their current set of ten 2-waydatabase and application servers that are more than five years old. In addition to savings potential in the areas ofoperating system and database charges, what other significant savings component should be highlighted?
A. Maintenance savings due to warranty on new machines
B. Reliability savings of using one machine versus ten
C. Financial savings due to cash outlays now versus later
D. Power savings even if the current power usage is unknown
Answer: A
10. Which of the following best describes Simultaneous Multi-threading (SMT)?
A. A POWER5 microprocessor feature that allocates two processors to each application
B. A Workload Manager feature that allows two processing threads to be executing on a single processor
C. An AIX v5.2 feature that allows two processing threads to be executing on a single processor concurrently
D. A POWER5 microprocessor feature that allows two processing threads to be executing on a single processorconcurrently
Answer: D

没有评论: