2008年9月22日星期一

Pass4side Oracle 1Z0-226 独家认证题库 2

题库内容摘自www.pass4side.cn 。更新时间:2008-9-22
6. XYZ is a chemical manufacturing company. On a daily basis, it produces 100 kilos of Item A from asingle production batcH.100 kilos of item A manufactured from a single batch has a single expiration datE. However, the purityof item A varies as follows:Category 1: 95%Category 2: 85%Category 3: 50%From an implementation perspective, which setup or process would meet this requirement?
A. Enable lot control. Map three categories as coproducts.
B. Enable lot control for item A. Create three lots to represent the categories.
C. Enable lot control for item A. Create three child lots and link them with the parent lot.
D. Enable lot and grade control for item A. Have three categories mapped with grades.
E. Enable lot and serial control for item A. Create one lot and three categories that are mapped withserial numbers.
Answer: D

7. For which type of move order is approval required?
A. Planning Move Order
B. Shipping Move Order
C. Production Move Order
D. Requisition Move Order
E. Replenishment Move Order
Answer: D

8. Identify four functions that a user can perform using the Material WorkbencH. (Choose four)A. Create move orders.
B. Create and save queries.
C. Change material statuses.
D. Perform miscellaneous issues.
E. Perform miscellaneous receipts.
F. Perform pick confirm transactions.
G. Perform ship confirm transactions.
H. View material in receiving, on-hand quantities, and intransit material.
Answer: ABCH

9. The client has decided that Quality and Discrete Manufacturing will be implemented at a future stage,so new supply from current manufacturing will be added to current inventory on hand by the OpenTransactions InterfacE.The immediate requirement is to go-live with Inventory and Order Management.Which three seeded transaction types can be omitted for material status control? (Choose threE. )
A. average cost update
B. all internal transactions
C. backflush subinventory transfer
D. miscellaneous issues and receipts
E. all transaction types related to Work in ProcessF. all transaction types related to Project Manufacturing
Answer: CEF

10. ACME attempts the Pick Release process for delivery lines that have been bookeD.Which three options are valid? (Choose three. )
A. Run the Auto Allocate process.
B. Run the Pick Slip Grouping process.
C. Run the Interface Trip Stop process.
D. Use the Standard Report Submission process (SRS).
E. Execute Online from the Release Sales Order window.
F. Run a concurrent program from the Release Sales Order window.
Answer: DEF

没有评论: